Get in touch
AIS House, 18, St.John Street, Fgura FGR 1447 Malta
T: +356 ­2180 3374
F: +356 ­2180 3434
E: info@ais.com.mt
Industries
The 1992 Rio de Janeiro Earth Summit set the scene for today’s eco-efficiency which has transformed industry from a system that takes, makes, and wastes into one that integrates economic, environmental and ethical concerns. AIS Environment helps clients achieve eco-efficiency by supporting them through the interrelated environment and development themes of sustainable use of resources including water, energy and the adoption of sustainable agriculture and sustainable tourism.
Energy
Energy
AIS Environment helps deliver clean energy solutions through renewable sources and improved energy efficiency.
Infrastructure
Infrastructure
AIS Environment understands the environmental impacts and social considerations of infrastructure projects in rural and urban spaces
Industrial and Commercial
Industrial and Commercial
AIS Environment provides consultancy services for residential, educational, tourism, industrial and commercial developments.
Resources Management
Resources Management
AIS Environment identifies conflicts between and manages the impact of development activity on our environment.
AIS Environment Featured Projects
  • Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Environmental Impact Statements and Appropriate Assessments were carried out by AIS Environment for two onshore and one offshore windfarms in Malta.
  • Waste to Energy
    Waste to Energy
    The assessment of waste-to-energy technologies, economic feasibility, site assessment and the applicability of a waste-to-energy facility in Malta wer ...
  • SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    A hazard identification study and an explosive atmosphere study were prepared in relation to the fuel conversion pr ...
  • Malta-Sicily Interconnector
    Malta-Sicily Interconnector
    The Interconnector required an Environmental Planning Statement, Construction Monitoring and Marine Environmental Monitoring.
  • Reconstruction and Widening of the Coast Road
    Reconstruction and Widening of the Coast Road
    Construction Monitoring and Ecological baseline surveys were carried out for the widening and upgrading of the Coast Road.
  • Inland, Surface and Transitional Waters Baseline Surveys
    Inland, Surface and Transitional Waters Baseline Surveys
    AIS Environment carried out the first national baseline surveys for inland, surface and transitional waters across ...
  • Sewage Treatment Plants
    Sewage Treatment Plants
    Environmental studies were carried out for the three proposed sewage treatment plants aiming at treating sewage before discharge.
Contact AIS Environment on +356 ­2180 3374 or E: info@ais.com.mt