PROJECTS » Environmental Performance & Compliance
Environmental issues often relate to major challenges arising from poor management and the inability to involve people in environmental decision making process.

Successful companies today are not only measured by how much profitable their products are but also how well they respond to the call to protect the natural environment. Companies are adapting their strategies in response to customers and stakeholders demand for compliance to environmental standards.

AIS Environment assists clients to achieve and manage their environmental objectives during the design and planning phases through the compilation of the necessary environmental permits. These permits include Environmental Permitting (EP) and Integrated Pollution Prevention and Control (IPPC) permits. Furthermore, AIS Environment also provide Environmental Audits which improve client operations and processes.
Noise Monitoring Survey – DPS and MPS
Noise Monitoring Survey – DPS and MPS
Noise monitoring surveys were carried out to assess the level of noise pollution produced by both Marsa and Delimara power plants.
Metalco Ltd- IPPC Permit
Metalco Ltd- IPPC Permit
AIS prepared an application for an IPPC permit on behalf of Metalco Ltd outlining their proposed pollution prevention plan for the facility. The appli ...
Mellieħa Holiday Centre EP
Mellieħa Holiday Centre EP
AIS prepared the Environmental Permitting application for the Mellieħa Holiday Centre; this work included the proposed extension of 30 bungalow units.
Environmental Monitoring -  Life Science Centre
Environmental Monitoring - Life Science Centre
Environmental monitoring focused on identifying any potential adverse environmental impacts (dust, noise and waste management) during the construction ...
Ecology Surveys of il-Hofra z-Zghira
Ecology Surveys of il-Hofra z-Zghira
Ecological Surveys for il-Ħofra ż-Żgħira are carried out annually to monitor the habitat types and species in the surrounding waters at Delimara, as p ...
Lighting Energy Audit
Lighting Energy Audit
AIS Environment designs energy performance models for businesses and proposes measures for saving energy and reducing costs.
Delimara Power Station
Delimara Power Station
AIS Environment carried out the Environment Impact Statement, compiled the IPPC permit and undertook AIr Quality monitoring at Marsaxlokk & B'Bugia.
AGV IPPC
AGV IPPC
An Integrated Pollution Prevention & Control form was prepared on behalf of AVG Non Ferrous Malta Ltd to report the handling and storage activities o ...
Bank of Valletta Waste Management Audit
Bank of Valletta Waste Management Audit
Reducing the amount of waste going to landfill meant introducing recycling bins and having a Waste Management Plan.
Selective Collection of the Organic Waste in Tourist Areas
Selective Collection of the Organic Waste in Tourist Areas
A pilot composting plant designed and appropriate collection systems promoted as part of the SCOW project.
Marsa Power Station
Marsa Power Station
AIS Environment carried out out a comprehensive audit of submitted figures for 2010 stack emissions from both Marsa & Delimara Power Stations
AIS Environment Featured Projects
  • Waste to Energy
    Waste to Energy
    The assessment of waste-to-energy technologies, economic feasibility, site assessment and the applicability of a waste-to-energy facility in Malta wer ...
  • SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    A hazard identification study and an explosive atmosphere study were prepared in relation to the fuel conversion pr ...
  • Sewage Treatment Plants
    Sewage Treatment Plants
    Environmental studies were carried out for the three proposed sewage treatment plants aiming at treating sewage before discharge.
  • Inland, Surface and Transitional Waters Baseline Surveys
    Inland, Surface and Transitional Waters Baseline Surveys
    AIS Environment carried out the first national baseline surveys for inland, surface and transitional waters across ...
  • Malta-Sicily Interconnector
    Malta-Sicily Interconnector
    The Interconnector required an Environmental Planning Statement, Construction Monitoring and Marine Environmental Monitoring.
  • Reconstruction and Widening of the Coast Road
    Reconstruction and Widening of the Coast Road
    Construction Monitoring and Ecological baseline surveys were carried out for the widening and upgrading of the Coast Road.
  • Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Environmental Impact Statements and Appropriate Assessments were carried out by AIS Environment for two onshore and one offshore windfarms in Malta.
Contact AIS Environment on +356 ­2180 3374 or E: info@ais.com.mt