PROJECTS » Environment Planning & Management

The Malta Environment and Planning Authority (MEPA) is the competent authority which regulates urban planning and assesses compliance to environmental legislation. Proposed infrastructural projects require development permits depending on function, size and location. As relevant, the development permitting mechanism will include any assessments/evaluations as may be required to address environmental issues.

In accordance with the European Environmental Directives, development proposals are screened against established criteria to determine whether mandatory formal assessments such as Environmental Impact Assessment (EIA) and Appropriate Assessment (AA) are required.

Strategic Environmental Assessments (SEA) evaluate the environmental considerations arising from national/local strategic plans or programmes. Following a change in the local SEA Regulations in 2010, it is the responsibility of the government and public entities to determine whether a SEA is required for their own plans and programmes (PPs) in accordance with the provisions of Legal Notice 497 of 2010.

Mellieħa Holiday Centre EP
Mellieħa Holiday Centre EP
AIS prepared the Environmental Permitting application for the Mellieħa Holiday Centre; this work included the proposed extension of 30 bungalow units.
Wied Blandun
Wied Blandun
AIS Environment carried out a preliminary study of the current environmental state of Wied Blandun and an associated risk assessment to guide further ...
Green Public Procurement (GPP) Update
Green Public Procurement (GPP) Update
An assessment of the National Action Plan for Green Public Procurement procedures was carried out by AIS Environment, and recommendations for the seco ...
PDS Malta Carnival Experience
PDS Malta Carnival Experience
A project description statement (PDS) was prepared to describe and assess the impacts caused by the proposed activities for the excavation to the requ ...
TIS For Construction Of A Double-Height Potato-Packaging Facility
TIS For Construction Of A Double-Height Potato-Packaging Facility
Traffic Impact Statement for construction of a double-height potato-packaging facility
Traffic Impact Statement For Alf Mizzi
Traffic Impact Statement For Alf Mizzi
Traffic Impact Statement for the demolition of existing dilapidated structures, conversion of an existing store into a Class 3c(c) gymnasium, restorat ...
Sewage Treatment Plants
Sewage Treatment Plants
Environmental studies were carried out for the three proposed sewage treatment plants aiming at treating sewage before discharge.
Waste Management Facility at Sant’ Antnin
Waste Management Facility at Sant’ Antnin
Environmental Baseline studies for the upgrading of the recycling and composting plant treating non-hazardous non-inert domestic waste.
Waste Transfer Facility in Gozo
Waste Transfer Facility in Gozo
Environmental studies were carried out to assess the development of a Waste Treatment and Transfer Facility in Gozo.
National Waste Management Plan
National Waste Management Plan
Strategic Environmental Assessment was carried out on Malta's National Waste Management Plan.
Traffic Impact Statement for MCP Car Park Extension
Traffic Impact Statement for MCP Car Park Extension
A Traffic Impact Statement was required to assess the traffic impact from the proposed works.
Traffic Impact Statement for the Islamic School
Traffic Impact Statement for the Islamic School
A Traffic Impact Statement was required for the expansion of the Muslim Primary School and additional works.
St Benedict College
St Benedict College
An Environmental Impact Statement was required for the proposed construction of a new Secondary School and Sports Complex at Kirkop.
Assesments at the Grand Harbour and Mgarr Harbour
Assesments at the Grand Harbour and Mgarr Harbour
Noise surveys and Marine Ecological surveys were carried out for proposed development at the Grand Harbour and Mgarr Harbour.
Incinerator at the Public Abattoir
Incinerator at the Public Abattoir
AIS Environment delivered an Environmental Planning Statement (EPS) for the upgrade of the Marsa Abattoir Incinerator.
Waste Management Facility at Għallis ta’ Ġewwa
Waste Management Facility at Għallis ta’ Ġewwa
Baseline environmental surveys were carried out for the Environmental Impact Assessment of a Waste Management Facility.
Storm Water Master Plan for the Maltese Islands
Storm Water Master Plan for the Maltese Islands
A Strategic Environmental Assessment was carried out to identify and assess the environmental implications of the proposed Plan.
Oil Tanking Malta increases storage capacity
Oil Tanking Malta increases storage capacity
An Environmental Planning Statement was required to identify and assess the environmental impacts of increasing storage capacity.
Proposed sports facilities/campus at MCAST
Proposed sports facilities/campus at MCAST
An Environment Impact Statement including environmental impacts and risks of the proposed development was required.
Malta-Sicily Interconnector
Malta-Sicily Interconnector
The Interconnector required an Environmental Planning Statement, Construction Monitoring and Marine Environmental Monitoring.
Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
Environmental Impact Statements and Appropriate Assessments were carried out by AIS Environment for two onshore and one offshore windfarms in Malta.
AIS Environment Featured Projects
  • Waste to Energy
    Waste to Energy
    The assessment of waste-to-energy technologies, economic feasibility, site assessment and the applicability of a waste-to-energy facility in Malta wer ...
  • SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    A hazard identification study and an explosive atmosphere study were prepared in relation to the fuel conversion pr ...
  • Sewage Treatment Plants
    Sewage Treatment Plants
    Environmental studies were carried out for the three proposed sewage treatment plants aiming at treating sewage before discharge.
  • Inland, Surface and Transitional Waters Baseline Surveys
    Inland, Surface and Transitional Waters Baseline Surveys
    AIS Environment carried out the first national baseline surveys for inland, surface and transitional waters across ...
  • Malta-Sicily Interconnector
    Malta-Sicily Interconnector
    The Interconnector required an Environmental Planning Statement, Construction Monitoring and Marine Environmental Monitoring.
  • Reconstruction and Widening of the Coast Road
    Reconstruction and Widening of the Coast Road
    Construction Monitoring and Ecological baseline surveys were carried out for the widening and upgrading of the Coast Road.
  • Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Environmental Impact Statements and Appropriate Assessments were carried out by AIS Environment for two onshore and one offshore windfarms in Malta.