Get in touch
AIS House, 18, St.John Street, Fgura FGR 1447 Malta
T: +356 ­2180 3374
F: +356 ­2180 3434
E: info@ais.com.mt
PROJECTS » Industrial and Commercial

AIS Environment is a key point of reference with many leading architects and developers who seek professional advice and support on environmental and social impact studies.

AIS Environment has the necessary experience and knowledge to provide services related to various residential, educational, industrial and commercial and tourism projects.Services provided for this sector include Traffic Impact Assessments, Landscape and Visual Assessment as well as various modelling such as wind, dispersion and wave modelling.
Noise Monitoring Survey – DPS and MPS
Noise Monitoring Survey – DPS and MPS
Noise monitoring surveys were carried out to assess the level of noise pollution produced by both Marsa and Delimara power plants.
Noise Monitoring Survey
Noise Monitoring Survey
LufthansaTechnik asked AIS Environment to conduct a noise monitoring survey to assess the levels of noise experienced by workers within the premises a ...
Metalco Ltd- IPPC Permit
Metalco Ltd- IPPC Permit
AIS prepared an application for an IPPC permit on behalf of Metalco Ltd outlining their proposed pollution prevention plan for the facility. The appli ...
Waste Management Plan- Mqabba Quarry
Waste Management Plan- Mqabba Quarry
Elbros Construction Ltd., commissioned AIS to prepare a WMP in relation to a disused quarry in Mqabba which has been proposed for use as a recycling f ...
Waste Management Plan – LIDL supermarket, Mosta
Waste Management Plan – LIDL supermarket, Mosta
A WMP was prepared for LIDL Immobiliare Malta Ltd., pertaining to the proposed supermarket in Mosta. AIS outlined a clear and concise plan for the man ...
Waste Management Plan – Hotel at Marsaxlokk
Waste Management Plan – Hotel at Marsaxlokk
AIS prepared a WMP on behalf of Bilom Group regarding the proposed development of a 125 bedroom hotel (Class 3B), including all amenities and semi-bas ...
Green Public Procurement (GPP) Update
Green Public Procurement (GPP) Update
An assessment of the National Action Plan for Green Public Procurement procedures was carried out by AIS Environment, and recommendations for the seco ...
Environmental Monitoring -  Life Science Centre
Environmental Monitoring - Life Science Centre
Environmental monitoring focused on identifying any potential adverse environmental impacts (dust, noise and waste management) during the construction ...
Biodiversity Plan
Biodiversity Plan
A biodiversity management plan to repair and restore the garigue habitat within the confinements of the Mellieha Holiday Centre, in relation to the ap ...
Proposed Petrol Station in Burmarrad – Air Quality Study
Proposed Petrol Station in Burmarrad – Air Quality Study
Baseline monitoring of the benzene concentration on the site for the proposed petrol station in Burmarrad was condu ...
TIS For Construction Of A Double-Height Potato-Packaging Facility
TIS For Construction Of A Double-Height Potato-Packaging Facility
Traffic Impact Statement for construction of a double-height potato-packaging facility
Traffic Impact Statement For Alf Mizzi
Traffic Impact Statement For Alf Mizzi
Traffic Impact Statement for the demolition of existing dilapidated structures, conversion of an existing store into a Class 3c(c) gymnasium, restorat ...
Traffic Impact Statement for MCP Car Park Extension
Traffic Impact Statement for MCP Car Park Extension
A Traffic Impact Statement was required to assess the traffic impact from the proposed works.
St Benedict College
St Benedict College
An Environmental Impact Statement was required for the proposed construction of a new Secondary School and Sports Complex at Kirkop.
Assesments at the Grand Harbour and Mgarr Harbour
Assesments at the Grand Harbour and Mgarr Harbour
Noise surveys and Marine Ecological surveys were carried out for proposed development at the Grand Harbour and Mgarr Harbour.
Bank of Valletta Waste Management Audit
Bank of Valletta Waste Management Audit
Reducing the amount of waste going to landfill meant introducing recycling bins and having a Waste Management Plan.
Selective Collection of the Organic Waste in Tourist Areas
Selective Collection of the Organic Waste in Tourist Areas
A pilot composting plant designed and appropriate collection systems promoted as part of the SCOW project.
Proposed sports facilities/campus at MCAST
Proposed sports facilities/campus at MCAST
An Environment Impact Statement including environmental impacts and risks of the proposed development was required.
AIS Environment Featured Projects
  • Waste to Energy
    Waste to Energy
    The assessment of waste-to-energy technologies, economic feasibility, site assessment and the applicability of a waste-to-energy facility in Malta wer ...
  • SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    A hazard identification study and an explosive atmosphere study were prepared in relation to the fuel conversion pr ...
  • Sewage Treatment Plants
    Sewage Treatment Plants
    Environmental studies were carried out for the three proposed sewage treatment plants aiming at treating sewage before discharge.
  • Inland, Surface and Transitional Waters Baseline Surveys
    Inland, Surface and Transitional Waters Baseline Surveys
    AIS Environment carried out the first national baseline surveys for inland, surface and transitional waters across ...
  • Malta-Sicily Interconnector
    Malta-Sicily Interconnector
    The Interconnector required an Environmental Planning Statement, Construction Monitoring and Marine Environmental Monitoring.
  • Reconstruction and Widening of the Coast Road
    Reconstruction and Widening of the Coast Road
    Construction Monitoring and Ecological baseline surveys were carried out for the widening and upgrading of the Coast Road.
  • Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Environmental Impact Statements and Appropriate Assessments were carried out by AIS Environment for two onshore and one offshore windfarms in Malta.
Contact AIS Environment on +356 ­2180 3374 or E: info@ais.com.mt