Get in touch
AIS House, 18, St.John Street, Fgura FGR 1447 Malta
T: +356 ­2180 3374
F: +356 ­2180 3434
E: info@ais.com.mt
PROJECTS » Infrastructure
Located in one of the most densely populated countries in the world with a prominent tourism industry, the supporting infrastructure is under continuous pressure and need for upgrade.
 
AIS Environment provides professional consultancy services to many infrastructure developments. Offering sound understanding on environmental impacts and social considerations in both rural and urban areas, AIS Environment’s experience is highly valued across a broad range of infrastructure developments including roads, tunnels, energy, water management, sewage treatment plants, landfills, waste treatment facilities and maritime developments.
PDS Malta Carnival Experience
PDS Malta Carnival Experience
A project description statement (PDS) was prepared to describe and assess the impacts caused by the proposed activities for the excavation to the requ ...
TIS For Construction Of A Double-Height Potato-Packaging Facility
TIS For Construction Of A Double-Height Potato-Packaging Facility
Traffic Impact Statement for construction of a double-height potato-packaging facility
Traffic Impact Statement For Alf Mizzi
Traffic Impact Statement For Alf Mizzi
Traffic Impact Statement for the demolition of existing dilapidated structures, conversion of an existing store into a Class 3c(c) gymnasium, restorat ...
SEPEM - Phase 3 conversion - Safety Studies, Atex Report
SEPEM - Phase 3 conversion - Safety Studies, Atex Report
A hazard identification study and an explosive atmosphere study were prepared in relation to the fuel conversion pr ...
Ecology Surveys of il-Hofra z-Zghira
Ecology Surveys of il-Hofra z-Zghira
Ecological Surveys for il-Ħofra ż-Żgħira are carried out annually to monitor the habitat types and species in the surrounding waters at Delimara, as p ...
Sa Maison Yacht Marina
Sa Maison Yacht Marina
In view of the proposed Sa Maison Yacht Marina, AIS Environment carried out a Marine Ecology Baseline Survey.
Delimara Power Station
Delimara Power Station
AIS Environment carried out the Environment Impact Statement, compiled the IPPC permit and undertook AIr Quality monitoring at Marsaxlokk & B'Bugia.
Sewage Treatment Plants
Sewage Treatment Plants
Environmental studies were carried out for the three proposed sewage treatment plants aiming at treating sewage before discharge.
Waste Management Facility at Sant’ Antnin
Waste Management Facility at Sant’ Antnin
Environmental Baseline studies for the upgrading of the recycling and composting plant treating non-hazardous non-inert domestic waste.
Waste Transfer Facility in Gozo
Waste Transfer Facility in Gozo
Environmental studies were carried out to assess the development of a Waste Treatment and Transfer Facility in Gozo.
Traffic Impact Statement for PBS
Traffic Impact Statement for PBS
The traffic to be generated from the proposed works was determined by a Traffic Impact Study.
Traffic Impact Statement for MCP Car Park Extension
Traffic Impact Statement for MCP Car Park Extension
A Traffic Impact Statement was required to assess the traffic impact from the proposed works.
Traffic Impact Statement for the Islamic School
Traffic Impact Statement for the Islamic School
A Traffic Impact Statement was required for the expansion of the Muslim Primary School and additional works.
Incinerator at the Public Abattoir
Incinerator at the Public Abattoir
AIS Environment delivered an Environmental Planning Statement (EPS) for the upgrade of the Marsa Abattoir Incinerator.
Waste Management Facility at Għallis ta’ Ġewwa
Waste Management Facility at Għallis ta’ Ġewwa
Baseline environmental surveys were carried out for the Environmental Impact Assessment of a Waste Management Facility.
Oil Tanking Malta increases storage capacity
Oil Tanking Malta increases storage capacity
An Environmental Planning Statement was required to identify and assess the environmental impacts of increasing storage capacity.
Malta-Sicily Interconnector
Malta-Sicily Interconnector
The Interconnector required an Environmental Planning Statement, Construction Monitoring and Marine Environmental Monitoring.
Reconstruction and Widening of the Coast Road
Reconstruction and Widening of the Coast Road
Construction Monitoring and Ecological baseline surveys were carried out for the widening and upgrading of the Coast Road.
Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
Environmental Impact Statements and Appropriate Assessments were carried out by AIS Environment for two onshore and one offshore windfarms in Malta.
Marsa Power Station
Marsa Power Station
AIS Environment carried out out a comprehensive audit of submitted figures for 2010 stack emissions from both Marsa & Delimara Power Stations
AIS Environment Featured Projects
  • Waste to Energy
    Waste to Energy
    The assessment of waste-to-energy technologies, economic feasibility, site assessment and the applicability of a waste-to-energy facility in Malta wer ...
  • SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    A hazard identification study and an explosive atmosphere study were prepared in relation to the fuel conversion pr ...
  • Sewage Treatment Plants
    Sewage Treatment Plants
    Environmental studies were carried out for the three proposed sewage treatment plants aiming at treating sewage before discharge.
  • Inland, Surface and Transitional Waters Baseline Surveys
    Inland, Surface and Transitional Waters Baseline Surveys
    AIS Environment carried out the first national baseline surveys for inland, surface and transitional waters across ...
  • Malta-Sicily Interconnector
    Malta-Sicily Interconnector
    The Interconnector required an Environmental Planning Statement, Construction Monitoring and Marine Environmental Monitoring.
  • Reconstruction and Widening of the Coast Road
    Reconstruction and Widening of the Coast Road
    Construction Monitoring and Ecological baseline surveys were carried out for the widening and upgrading of the Coast Road.
  • Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Environmental Impact Statements and Appropriate Assessments were carried out by AIS Environment for two onshore and one offshore windfarms in Malta.
Contact AIS Environment on +356 ­2180 3374 or E: info@ais.com.mt