PROJECTS » Resources Management
Any activity brings about conflicts between meeting the process or development needs and safeguarding resources. AIS Environment uses appropriate Environmental Resource Management tools to identify these conflicts and helps manage the interaction and impact of the activity on the environment.

When applying these tools, AIS Environment aims to ensure that ecosystems and habitats are protected and maintained whilst maintaining ecosystem integrity through considering ethical, economic, and scientific (ecological) variables. Environmental Resource Management is thus linked to environmental protection and sustainability.
Proposed Petrol Station in Burmarrad – Air Quality Study
Proposed Petrol Station in Burmarrad – Air Quality Study
Baseline monitoring of the benzene concentration on the site for the proposed petrol station in Burmarrad was condu ...
Biodiversity Plan
Biodiversity Plan
A biodiversity management plan to repair and restore the garigue habitat within the confinements of the Mellieha Holiday Centre, in relation to the ap ...
Green Public Procurement (GPP) Update
Green Public Procurement (GPP) Update
An assessment of the National Action Plan for Green Public Procurement procedures was carried out by AIS Environment, and recommendations for the seco ...
Wied Blandun
Wied Blandun
AIS Environment carried out a preliminary study of the current environmental state of Wied Blandun and an associated risk assessment to guide further ...
Mellieħa Holiday Centre EP
Mellieħa Holiday Centre EP
AIS prepared the Environmental Permitting application for the Mellieħa Holiday Centre; this work included the proposed extension of 30 bungalow units.
Waste Management Plan- Mqabba Quarry
Waste Management Plan- Mqabba Quarry
Elbros Construction Ltd., commissioned AIS to prepare a WMP in relation to a disused quarry in Mqabba which has been proposed for use as a recycling f ...
Waste Management Plan – Hotel at Marsaxlokk
Waste Management Plan – Hotel at Marsaxlokk
AIS prepared a WMP on behalf of Bilom Group regarding the proposed development of a 125 bedroom hotel (Class 3B), including all amenities and semi-bas ...
Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
Environmental Impact Statements and Appropriate Assessments were carried out by AIS Environment for two onshore and one offshore windfarms in Malta.
Waste to Energy
Waste to Energy
The assessment of waste-to-energy technologies, economic feasibility, site assessment and the applicability of a waste-to-energy facility in Malta wer ...
Delimara Power Station
Delimara Power Station
AIS Environment carried out the Environment Impact Statement, compiled the IPPC permit and undertook AIr Quality monitoring at Marsaxlokk & B'Bugia.
Malta-Sicily Interconnector
Malta-Sicily Interconnector
The Interconnector required an Environmental Planning Statement, Construction Monitoring and Marine Environmental Monitoring.
Selective Collection of the Organic Waste in Tourist Areas
Selective Collection of the Organic Waste in Tourist Areas
A pilot composting plant designed and appropriate collection systems promoted as part of the SCOW project.
Coastal Water Baseline Surveys for the Maltese Islands
Coastal Water Baseline Surveys for the Maltese Islands
AIS Environment carried out the first national baseline surveys covering the Maltese coast.
Inland, Surface and Transitional Waters Baseline Surveys
Inland, Surface and Transitional Waters Baseline Surveys
AIS Environment carried out the first national baseline surveys for inland, surface and transitional waters across ...
Waste Management Facility at Għallis ta’ Ġewwa
Waste Management Facility at Għallis ta’ Ġewwa
Baseline environmental surveys were carried out for the Environmental Impact Assessment of a Waste Management Facility.
National Waste Management Plan
National Waste Management Plan
Strategic Environmental Assessment was carried out on Malta's National Waste Management Plan.
Storm Water Master Plan for the Maltese Islands
Storm Water Master Plan for the Maltese Islands
A Strategic Environmental Assessment was carried out to identify and assess the environmental implications of the proposed Plan.
Waste Management Facility at Sant’ Antnin
Waste Management Facility at Sant’ Antnin
Environmental Baseline studies for the upgrading of the recycling and composting plant treating non-hazardous non-inert domestic waste.
Incinerator at the Public Abattoir
Incinerator at the Public Abattoir
AIS Environment delivered an Environmental Planning Statement (EPS) for the upgrade of the Marsa Abattoir Incinerator.
Waste Transfer Facility in Gozo
Waste Transfer Facility in Gozo
Environmental studies were carried out to assess the development of a Waste Treatment and Transfer Facility in Gozo.
Marine Scientific Surveys around Filfla for its Conservation
Marine Scientific Surveys around Filfla for its Conservation
Marine Scientific Surveys were required to investigate the conservation potential in the sea around Filfla.
Sa Maison Yacht Marina
Sa Maison Yacht Marina
In view of the proposed Sa Maison Yacht Marina, AIS Environment carried out a Marine Ecology Baseline Survey.
Monitoring of Nutrient Status and Eutrophication Status
Monitoring of Nutrient Status and Eutrophication Status
Baseline surveys to monitor the nitrate concentrations and eutrophication levels in three coastal inlets and bays.
Marsa Power Station
Marsa Power Station
AIS Environment carried out out a comprehensive audit of submitted figures for 2010 stack emissions from both Marsa & Delimara Power Stations
Proposed sports facilities/campus at MCAST
Proposed sports facilities/campus at MCAST
An Environment Impact Statement including environmental impacts and risks of the proposed development was required.
Oil Tanking Malta increases storage capacity
Oil Tanking Malta increases storage capacity
An Environmental Planning Statement was required to identify and assess the environmental impacts of increasing storage capacity.
St Benedict College
St Benedict College
An Environmental Impact Statement was required for the proposed construction of a new Secondary School and Sports Complex at Kirkop.
Assesments at the Grand Harbour and Mgarr Harbour
Assesments at the Grand Harbour and Mgarr Harbour
Noise surveys and Marine Ecological surveys were carried out for proposed development at the Grand Harbour and Mgarr Harbour.
AIS Environment Featured Projects
  • Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
    Environmental Impact Statements and Appropriate Assessments were carried out by AIS Environment for two onshore and one offshore windfarms in Malta.
  • Waste to Energy
    Waste to Energy
    The assessment of waste-to-energy technologies, economic feasibility, site assessment and the applicability of a waste-to-energy facility in Malta wer ...
  • SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    SEPEM - Phase 3 conversion - Safety Studies, Atex Report
    A hazard identification study and an explosive atmosphere study were prepared in relation to the fuel conversion pr ...
  • Malta-Sicily Interconnector
    Malta-Sicily Interconnector
    The Interconnector required an Environmental Planning Statement, Construction Monitoring and Marine Environmental Monitoring.
  • Reconstruction and Widening of the Coast Road
    Reconstruction and Widening of the Coast Road
    Construction Monitoring and Ecological baseline surveys were carried out for the widening and upgrading of the Coast Road.
  • Inland, Surface and Transitional Waters Baseline Surveys
    Inland, Surface and Transitional Waters Baseline Surveys
    AIS Environment carried out the first national baseline surveys for inland, surface and transitional waters across ...
  • Sewage Treatment Plants
    Sewage Treatment Plants
    Environmental studies were carried out for the three proposed sewage treatment plants aiming at treating sewage before discharge.